Search

PVC-U Pipe (For Water Supply)


The company operates dozens of advanced PVC pipe production lines in China, utilizing state-of-the-art manufacturing technology and lead-free formulations to provide customers with safe, hygienic, and high-quality piping products. All raw and auxiliary materials undergo strict quality inspection upon entry to ensure both the superior quality and sanitary safety of the pipes, without causing any contamination to water quality.

Category:


Retail Consultation:

+86 19501968318 (Ms. Gao)

+86 19501968318 (Ms. Gao)

Retail@dyjs.com (Ms. Gao)

Project Consultation:

+86 19501990021 (Mr. Fu)

+86 19501990021 (Mr. Fu)

Business Consultation:

+86 15801079918 (Account Manager)

dayu@dyjs.com (Account Manager)

Inquire Now

  • Advantages
  • Specifications
  • Instructions for Use
    • Commodity name: PVC-U Pipe (For Water Supply)

    The company operates dozens of advanced PVC pipe production lines in China, utilizing state-of-the-art manufacturing technology and lead-free formulations to provide customers with safe, hygienic, and high-quality piping products. All raw and auxiliary materials undergo strict quality inspection upon entry to ensure both the superior quality and sanitary safety of the pipes, without causing any contamination to water quality.

    Product Advantages

    • Lightweight, easy to transport and handle
      Low density, easy to transport, handle, and install
    • Excellent corrosion resistance
      It has excellent resistance to acids, alkalis, and corrosion, making it highly suitable for applications in the chemical industry
    • Low fluid resistance
      The inner surface of the pipe is smooth, with a roughness coefficient of only 0.009, resulting in low fluid resistance. This effectively improves the hydraulic conditions of the pipeline network and reduces operational costs
    • High mechanical strength
      The pipes have good pressure resistance, impact resistance, and tensile strength performance.
    • Easy to install
      The pipe connection is quick and easy to install, resulting in low construction costs
    • Does not affect water quality
      It has been confirmed through dissolution tests that it does not affect water quality, making it suitable for widespread application

     

    Application

    • Residential and industrial building indoor water supply and reclaimed water systems;
    • Undergroundwater supply systems for residential communities and factories;
    • Urban water supply pipeline systems;
    • Water treatment pipeline systems for water treatment plants;
    • Marine aquaculture industry;
    • Landscaping irrigation, well drilling, and other industrial piping applications.

     

    Customization

    • R-end and plain-end options are available, with standard lengths of 6 meters, 8 meters, 9 meters, 10 meters, and 12 meters.Custom specifications and lengths can be tailored according to customer requirements
  • Specifications

  • PVC Pipe Installation Methods

    Sealing Rubber Ring Connection Installation Procedure
    1.Clean the inner surface of the socket and the outer surface of the spigot.
    2.Place the rubber ring in the socket groove with the correct orientation (larger end facing inward, smaller end facing outward).
    3.Mark the insertion depth on the spigot end.
    4.Align the spigot end with the bell end and insert the pipe until it reaches the marked line.
    5.Use a feeler gauge to check the rubber ring around the circumference to ensure it is properly seated.

     

    Adhesive Bonding Connection Installation Procedure
    1.Cutting: Cut the pipe to the required size evenly and perpendicularly, then bevel the edges.
    2.Cleaning: Clean the dust and grease from the spigot surface and the inner surface ofthe bell.
    3.Applying: Apply the adhesive evenly and quickly to both the spigot surface and the inner surface of the bell.
    4.Inserting: Align the center lines of the two pipes or the pipe and fitting, then quickly insert and rotate 1/4
    turn to ensure the adhesive is evenly distributed between the spigot and bell.
    5.Holding: Keep the pipe in place to allow the adhesive to set, maintaining pressure for at least one minute, and then wipe offany excess adhesive from the outside of the pipe.
    6.Completion: After the connection, avoid applying load to the pipe within ten minutes.

Related products

Related products

Please select the project you want to consult about

Project Inquiry

* Please make sure to fill in the information accurately and keep communication open. We will contact you as soon as possible.

Gender

+86
  • +86 CN

Please provide more information about your field or project.

What irrigation method are you currently using?
What type of crops are you currently growing?
Select the crops you are interested in
Current planting area (ha)
Submit
%{tishi_zhanwei}%

Retail Inquiry

* Please make sure to fill in the information accurately and keep communication open. We will contact you as soon as possible.

Gender

+86
  • +86 CN

Please provide more information about your field or project.

What irrigation method are you currently using?
What type of crops are you currently growing?
Select the crops you are interested in
Current planting area (ha)
Submit
%{tishi_zhanwei}%